{"url":"https://data.reddeer.ca/api/datasets/building-permits/BP037004","permitNumber":"BP037004","reportCode":"RENO","permitDate":"2015-04-09T00:00:00","type":"PUBLIC SERVICE","subType":"PLACE OF WORSHIP","description":"Fire Separation from Ground Floor to Main Floor","status":"COMPLETED","contractor":"CHRIST CORRIDOR CHURCH","block":"C","planNumber":"5560HW","lot":"1 TO 4","address":"5515 43 ST","landUseDistrict":"R-D","fee":76.9000,"value":5000.0000}